It will happen because storm frequency and outages will rise throughout the century. It is a capital investment that will sharply reduce outages. Florida is on the verge of putting their long-haul power underground. Texas is primed for storms due to the high
 and growing humidity in the Gulf. Finally, capital costs - interest - is low. Both governments and big corporates pay very little to borrow so it is not onerous. May be it is time to make America great again.
<span id="😉">😉</span><br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Nor does it have to be mandatory for all systems. But there should be at least one power network in the ground as well as one telco network.
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Regards, <br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Roderick. <br>
</div>
<div>
<div id="appendonsend"></div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<hr tabindex="-1" style="display:inline-block; width:98%">
<div id="divRplyFwdMsg" dir="ltr"><font style="font-size:11pt" face="Calibri, sans-serif" color="#000000"><b>From:</b> Jared Mauch <jared@puck.nether.net><br>
<b>Sent:</b> Tuesday, February 16, 2021 3:38 PM<br>
<b>To:</b> Mike Hammett <nanog@ics-il.net><br>
<b>Cc:</b> Rod Beck <rod.beck@unitedcablecompany.com>; nanog@nanog.org <nanog@nanog.org><br>
<b>Subject:</b> Re: Texas internet connectivity declining due to blackouts</font>
<div> </div>
</div>
<div class="BodyFragment"><font size="2"><span style="font-size:11pt">
<div class="PlainText"><br>
<br>
> On Feb 16, 2021, at 8:25 AM, Mike Hammett <nanog@ics-il.net> wrote:<br>
> <br>
> It's cheaper to build 2x, 3x, 4x the aerial plant than to build 1x the underground plant.<br>
> <br>
> The actual cost per foot is more like 10x difference, but there are right of way, maintenance, etc. costs to factor in as well.<br>
> <br>
<br>
Labor is something in 8x but the permit/engineering cost is usually the same per foot, but the make-ready on poles can make underground competitive or more like 1.5x when you fully bake the costs.  Really depends on pole distances and quality.  O&M long-term
 is lower on underground vs aerial.<br>
<br>
- Jared</div>