<div dir="ltr">is there any limitation of where an SLTE can be placed in terms of distance from PFE?<div><br></div><div>I have looked in to usual palaces and i was unable to confirm there is any requirements for any distance. Any cons can you guys think of that you want to share would be appreciated.</div><div><br></div><div>here are places I have looked at</div><div><br></div><div><a href="http://opticalcloudinfra.com/index.php/2018/03/28/whys-hows-open-subsea-cable-systems/">http://opticalcloudinfra.com/index.php/2018/03/28/whys-hows-open-subsea-cable-systems/</a><br></div><div><br></div><div><a href="https://www.osa.org/osaorg/media/osa.media/OSAF/Banners/Cable_Powering.pdf">https://www.osa.org/osaorg/media/osa.media/OSAF/Banners/Cable_Powering.pdf</a><br></div><div><br></div><div><a href="http://opticalcloudinfra.com/index.php/2016/02/27/why-open-subsea-cable-systems/">http://opticalcloudinfra.com/index.php/2016/02/27/why-open-subsea-cable-systems/</a><br></div><div><br></div><div>thank you</div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Tue, Nov 26, 2019 at 1:03 PM Mark Tinka <<a href="mailto:mark.tinka@seacom.mu">mark.tinka@seacom.mu</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><br>
<br>
On 26/Nov/19 18:47, Ben Cannon wrote:<br>
<br>
> Nowadays however, the CLS is looked at more like an ILA shelter, or<br>
> when feasible cable landings are going directly into metro CNDCs as<br>
> the physical gear is getting smaller and smaller and more suitable for<br>
> colocation.<br>
<br>
Nowadays, the SLTE sits in a proper data centre.<br>
<br>
<br>
><br>
> There’s still the small matter of 11,000volts of power or more…<br>
>  That’s usually kept out towards the sea.<br>
<br>
Yes, PFE's will generally live at the CLS.<br>
<br>
Mark.<br>
</blockquote></div>