DHS letters for fuel and facility access

Mark Tinka mark.tinka at seacom.mu
Wed Mar 18 14:23:57 UTC 2020



On 17/Mar/20 19:08, Warren Kumari wrote:

>
> We had specified that the transfer pump be on the generator feed,
> there was a schematic showing at is being on the generator feed, there
> was even a breaker with a cable marked  "Transfer Pump (HP4,5)" ---
> but it turned out to just be a ~3ft piece of cable stuffed into a
> conduit, and not actually, you know, running all the way down to the
> basement and connected to the transfer pump.

It's the things you rarely think about.

The Fukushima Daiichi nuclear power plant backup generator situation
comes to mind as well.

Mark.