On 6/Jan/20 23:04, Michael Thomas wrote:

>  
>
> Seems to me that should be a pretty big consideration before signing a
> lease. But what I was really getting at is fiber to the building, with
> distribution unspecified. At least here in California -- the land of a
> million suburbs -- it's just a matter of the will to get the job done.
> And unlike wireless, the tin foil hat types and nimby's probably don't
> have a big problem with laying fiber. If wireless operators think they
> can complete, by all means bring it.

There will always be someone that is bringing fibre to the (new)
building. The question is whether it is shared infrastructure like
ducts, where each operator can blow their own piece, or whether it's an
exclusive operator from whom all interested parties need to lease.

Mark.