FTTP Advice, Michigan and other areas
Fletcher Kittredge
fkittred at gwi.net
Tue Sep 1 22:54:40 UTC 2015
Jared;
What you are trying to do is quite achievable, but a huge topic worthy of a
book, not an email post. Also, situations vary significantly between states
due to incumbents, regulatory regimes, and level of state support. NANOG is
a bad place to get advice about this topic. There are many other venues
with literally thousands of other organizations/groups/companies on the
same path as you. I would start from the FTTH Council, Next Century Cities,
Institute for Local Self-Reliance and work out from there.
On Tue, Sep 1, 2015 at 4:27 PM, Jared Mauch <jared at puck.nether.net> wrote:
> I’m looking for some advice/input from people either public or private
> about woes building fiber to reach people outside the footprints of the
> existing incumbents.
>
> There is a group of people looking to organize private fiber to reach
> areas that are unserved.
>
> There’s been recent local people doing this like Lightspeed (Lansing) and
> the Vergennes Broadband folks.
>
> When it come to private right of way, public right of way use, swaps, pole
> attach and other things, any best practices people can share either in
> public or private?
>
> TL;DR background for those interested:
>
> Many wireless ISPs are finding it harder to locate equipment or
> utilize frequencies based on interference or congestion. Advanced
> encodings like 16-QAM that are seen in 802.11ac hardware also introduce
> latencies that are not ideal. The FCC is also making it harder for
> equipment to be qualified in this space, in some cases rightly so due to
> out of band emissions or just adjacent frequency noise. The revisions of
> rules in 5Ghz are helpful, but the cellular industry is also looking to
> exploit these frequencies to solve indoor coverage.
>
> There are two groups I’m trying to assist, a local cooperative
> which is trying to just own the fiber and let providers gain access and
> some WISPs that are looking to improve service due to increase customer
> demand.
>
> Getting service on the fiber is “easy” once it’s there, but
> gaining access or building it is the part I’m looking for insights in.
>
> - Jared
>
>
--
Fletcher Kittredge
GWI
8 Pomerleau Street
Biddeford, ME 04005-9457
207-602-1134
More information about the NANOG
mailing list