"2M today, 10M with no change in technology"? An informal survey.
Eric Gauthier
eric at roxanne.org
Tue Aug 28 21:40:32 UTC 2007
Bill,
[...]
> 2. Once the limit is reached, excess routes will fail over to software
> switching. TAC did not specify how routes are designated as excess.
I'm not sure if the Sup2's handle this case differently from the
Sup720s we were using, but, in our case, when we reached the ceilign
the routes appeared in both the routing and CEF tables but were not
populated into the FIB.
Translation: the route was ignored....
Eric :)
More information about the NANOG
mailing list