[OT] Level3, 111 8th
Sean Crandall
sean at megapath.net
Sat Dec 20 09:43:20 UTC 2003
> On Fri Dec 19, 2003 at 06:15:02PM -0500, Charles Sprickman wrote:
> Anyway, once the circuit is installed, you should get a DLR
> from the telco, which *has* to show the exact demarc (suite,
> row, rack, shelf, ports, etc), which you then provide to
> Level3 with a cross connect order. If the DLR is wrong,
> expect Level3 to sit on it for a month before coming back
> saying that it's wrong.
We have actually had fairly decent time getting circuits installed into that
gateway. If possible, order your T-1 from someone that actually has their
own cabinets within L3's suite. I have about five DS-3s, an OC-3 and a
couple of POTS lines and have never had any major problems with the
installs.
We've occasionally gotten the bad DLR from a vendor and L3 usually let us
know within a couple of days of when we sent them the DLR that there was a
problem.
-Sean
Network Engineering
MegaPath Networks Inc.
More information about the NANOG
mailing list