NERC summer 2003 power predictions
Sean Donelan
sean at donelan.com
Thu Aug 14 23:34:24 UTC 2003
>From North American Electric Reliability Council May 2003 Reliability
Summer Assessment
Assessment Summary
Generating resources are expected to be adequate to meet projected demand
for electricity in North America this summer. However, there are some
areas of concern in NPCC: southwestern Connecticut, New York City and
Long Island. Locally tight resources compounded by transmission
limitations into and within those areas make them particularly susceptible
to reliability problems that can be caused if there is lower than
expected generating unit availability, or high demand caused by extreme
weather.
Even in areas where resources are expected to be adequate, unanticipated
equipment problems and extreme weather can combine to produce situations
in which demands temporarily exceed available generation and transmission
capacity.