Reducing power consumption in generator-supplied facilities
dennis opacki
dopacki at adotout.com
Wed Sep 12 14:31:21 UTC 2001
What steps are folks taking to maximize run time of emergency
generator equipment and battery in NY facilities currently facing diesel
supply issues? Are second halves of redundant systems being temporarily
taken off line and non-essential loads being shed in a effort to stretch
the time to failure? In a previous life, such precutions were referred to
as "rigging for reduced electrical power" and proved quite effective.
Thanks,
-Dennis
More information about the NANOG
mailing list