Joel Jaeggli joelja at darkwing.uoregon.edu
Wed Feb 28 18:18:31 UTC 2001


On Wed, 28 Feb 2001, Joe Abley wrote:

>
> On Wed, Feb 28, 2001 at 08:23:19AM -0800, Lucy E. Lynch wrote:
> > Our big costs were US West curcuits into the hotel (6xT1 - we could have
> > gotten away with 4xT1) and cable - we had lenghts cut to fit the table
> > layout in the ballroom. We had switches & such on hand, and we "borrowed"
> > terminal room machines from one of the student labs -
>
> If these costs were negligible, how much would it have cost?
>
> (assuming, for example, an 802.11b shot from a hotel to an already-
> connected nearby building, donated transit,

we actually tried to do a wireless run as a backup plan, but couldn't find
an open conduit, and the hotel balked at the thought of our wiring guys
coring 11 floors in order to get to the roof...

I don't think nanog is quite ready to go wireless only in the meeting room
although cutting down on the wired infrastructure deployed is something
that's been worked on...

> doing wireless-only in the
> conference and having some friendly vendor loan the machines for the
> terminal room).
>
>
> Joe
>

-- 
--------------------------------------------------------------------------
Joel Jaeggli				       joelja at darkwing.uoregon.edu
Academic User Services			     consult at gladstone.uoregon.edu
     PGP Key Fingerprint: 1DE9 8FCA 51FB 4195 B42A 9C32 A30D 121E
--------------------------------------------------------------------------
It is clear that the arm of criticism cannot replace the criticism of
arms.  Karl Marx -- Introduction to the critique of Hegel's Philosophy of
the right, 1843.






More information about the NANOG mailing list