MAE-East still no generator
Nathan Stratton
nathan at netrail.net
Sun Sep 8 02:56:32 UTC 1996
On Sat, 7 Sep 1996, Dorian R. Kim wrote:
> People should build robust enough infrastructure so that they don't rely on
> MAE-East so much. The current MAE-East is a disaster waiting to happen. Just
> hope that there isn't a flood in that area any time soon.
>
> Oh, speaking of environmental conditions, I hope folks who are on DC power
> check their wire. Last time I was there, most of them were hooked up using
> 10 amp wire and were running pretty hot.
Hehe, ya I was in there not to long ago and that wire was very hot. I
agree that you should build a network infrastructure so that when MAE-East
is dead you are ok, I just don't think that is the point. MAE-East needs
to have some money dumped in to fix some of the power and other problems
before it is a big disaster.
Nathan Stratton CEO, NetRail, Inc. Tracking the future today!
---------------------------------------------------------------------------
Phone (703)524-4800 NetRail, Inc.
Fax (703)534-5033 2007 N. 15 St. Suite 5
Email sales at netrail.net Arlington, Va. 22201
WWW http://www.netrail.net/ Access: (703) 524-4802 guest
---------------------------------------------------------------------------
"Therefore do not worry about tomorrow, for tomorrow will worry about
itself. Each day has enough trouble of its own." Matthew 6:34
More information about the NANOG
mailing list