Phase 5 Status
Mitch Levinn
levinn at nisc.psi.net
Mon Nov 22 17:08:54 UTC 1993
Hi there,
Sorry if I've missed some details about these upgrades,
but I'm concerned that the upgrades scheduled for the same evening
don't all happen at once. In particular, those scheduled for 12/18
involve taking both E133 and E136 down. If both are down at the
same time, the NSFNet would lose connectivity to PSINet. If the
down times are already scheduled to be staggered, please let us
know when each will be down. If they are not already so scheduled,
can they be?
-Mitch
More information about the NANOG
mailing list