Justin Streiner streinerj at gmail.com
Sat Dec 9 04:17:10 UTC 2023


We just built a new house in 2021. The builder ran 2" schedule 40 from the
side of the house out to the distribution point in front of my neighbor's
house.  I didn't specify 2" - that's what the builder ran.  A portion of
that run must have existed before construction because no one had to tear
up my neighbor's yard to get to the distro box.

Once I convinced Verizon that Fios was indeed available in this
neighborhood (separate matter entirely), it was an easy matter for the tech
to pull the drop cable through the empty conduit, drill a hole a few feet
above the foundation and land the cable in the basement.

I didn't run any surface tube or conduit in the basement, but there was
enough room for the install tech to run the cable without too much of a
fight.

Thank you
jms

On Fri, Dec 8, 2023, 2:06 PM Eric Kuhnke <eric.kuhnke at gmail.com> wrote:

> If anyone assumes that residential real estate general contractors and low
> voltage/wiring subcontractors know or care about wifi signal or not putting
> RF units inside metal boxes - that would be a bad assumption to make.
>
>
> On Thu, Dec 7, 2023 at 10:18 PM Jay Hennigan <jay at west.net> wrote:
>
>> On 12/6/23 23:22, Eric Kuhnke wrote:
>> > I think an important point for pre-wire and residential real estate
>> > developers to consider is also the conflicting needs of keeping things
>> > "neat and tidy" and last mile CPE location vs wifi coverage.
>>
>> If you assume that the appropriate place for a wifi access point is
>> colocated with the NID/ONT/CPE, you're doing it wrong.
>>
>> --
>> Jay Hennigan - jay at west.net
>> Network Engineering - CCIE #7880
>> 503 897-8550 - WB6RDV
>>
>>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.nanog.org/pipermail/nanog/attachments/20231208/2cdbfb7a/attachment.html>


More information about the NANOG mailing list